ITAC Assessment: AM0488
ITAC logo
ITAC Assessment: AM0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Skids and modules
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 191,000
ft2
Annual Production 4,474
ton
Production Hrs. Annual 5,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $402,534 5,991,922
kWh
Electricity Demand $71,442 12,624
kW-mo/yr
Electricity Fees $2,196 -
Natural Gas $7,205 712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 4.426: Modify workload $12,700 $9,000 - - $12,700 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,570 $1,000 $6,600
108,000
kWh
$970
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,850 $13 $5,100
84,000
kWh
$750
-
kW-mo/yr
- -
04 4.426: Modify workload $4,200 $15,000 - - - $4,200
05 2.7145: Install skylights $2,215 $10,700 $2,215
73,400
kWh
- - -
06 2.4133: Use most efficient type of electric motors $2,290 $6,576 $1,770
29,045
kWh
$520
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $1,910 - $1,670
27,400
kWh
$240
-
kW-mo/yr
- -
08 2.7124: Make a practice of turning off lights when not needed $1,600 $150 $1,350
22,100
kWh
$250
-
kW-mo/yr
- -
09 2.7124: Make a practice of turning off lights when not needed $1,500 - $1,500
24,800
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $930 $460 $190
3,115
kWh
$15
-
kW-mo/yr
- $725
11 2.8114: Change rate schedules or other changes in utility service $206 - - - - $206
TOTAL RECOMMENDED $40,971 $42,899 $20,395
371,860
kWh
$2,745
-
kW-mo/yr
$12,700 $5,131
TOTAL IMPLEMENTED $28,805 $27,886 $13,625
260,460
kWh
$1,755
-
kW-mo/yr
$12,700 $725
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs