ITAC Assessment: IC0330
ITAC logo
ITAC Assessment: IC0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Office Space and Material Testing Labs
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 100
Plant Area 17,976
ft2
Annual Production 1
units
Production Hrs. Annual 3,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,993 343,492
kWh
Electricity Demand $4,525 873
kW-mo/yr
Electricity Fees $1,043 -
Natural Gas $12,587 2,158
MMBtu
TOTAL YEARLY COSTS $60,147
RECOMMENDED SAVINGS* $22,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $14,194 $77,871 $11,278
93,983
kWh
$2,916
-
kW-mo/yr
-
02 2.7444: Close holes and openings in building such as broken windows $860 $218 $296
2,471
kWh
$67
-
kW-mo/yr
$496
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,278 $2,275 $3,278
27,316
kWh
- -
04 2.2511: Insulate bare equipment $1,913 $1,710 $1,724
14,367
kWh
$189
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $1,832 $1,110 - - $1,832
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $445 $150 $406
3,387
kWh
$39
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $249 $1,751 $171
1,428
kWh
$78
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,771 $85,085 $17,154
142,953
kWh
$3,289
-
kW-mo/yr
$2,327
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs