ITAC Assessment: IC0319
ITAC logo
ITAC Assessment: IC0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Printed/Etched Retail Products
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $100
M
to 500
M
# of Employees 326
Plant Area 361,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 4,833
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,461 5,494,129
kWh
Electricity Demand $195,473 14,819
kW-mo/yr
Electricity Fees $142,097 -
Natural Gas $54,942 9,772
MMBtu
Waste Disposal Costs
Water Usage $39,258 2,108
Tgal
TOTAL YEARLY COSTS $620,231
RECOMMENDED SAVINGS* $81,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $5,393 $16,567 $2,246
66,068
kWh
- $3,147
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $9,099 $14,469 $5,510
162,048
kWh
$3,590
-
kW-mo/yr
-
03 2.3132: Recharge batteries on during off-peak demand periods $8,428 - - $8,428
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $2,018 $5,197 $1,054
30,992
kWh
$964
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $275 - $275
8,008
kWh
- -
06 2.7135: Install occupancy sensors $2,117 $2,486 $681
20,043
kWh
$1,436
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $295 $481 $18
528
kWh
$277
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $10,088 $20,716 $3,077
90,511
kWh
$7,011
-
kW-mo/yr
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,027 - $1,542
45,341
kWh
$1,485
-
kW-mo/yr
-
10 2.2426: Use waste heat from flue gases to heat space conditioning air $4,445 $3,414 - - $4,445
-
MMBtu
11 2.4239: Eliminate or reduce compressed air usage $33,790 $16,614 $2,457
72,255
kWh
$31,333
-
kW-mo/yr
-
12 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,597 $5,347 - - $1,597
-
MMBtu
13 2.4221: Install compressor air intakes in coolest locations $799 $519 $407
11,968
kWh
$393
-
kW-mo/yr
-
TOTAL RECOMMENDED $81,371 $85,809 $17,267
507,763
kWh
$54,915
-
kW-mo/yr
$9,189
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs