ITAC Assessment: IC0180
ITAC logo
ITAC Assessment: IC0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Corrugated Sheets and Displays
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 164
Plant Area 235,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,614 4,281,792
kWh
Electricity Demand $111,471 11,124
kW-mo/yr
Natural Gas $862,295 65,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $1 $252
4,940
kWh
$68
-
kW-mo/yr
- - $327
02 2.4133: Use most efficient type of electric motors $1,738 $4,051 $1,117
21,885
kWh
$621
-
kW-mo/yr
- - -
03 2.4151: Develop a repair/replace policy $5,192 $13,100 $5,158
101,146
kWh
$34
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,894 $6,894 $6,894
135,159
kWh
- - - -
05 2.422: Hardware $821 $6,057 $821
16,408
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $773 - $773
10,531
kWh
- - - -
07 2.4221: Install compressor air intakes in coolest locations $2,036 - $1,111
21,775
kWh
$925
-
kW-mo/yr
- - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $15,984 $76 - - $15,984
-
MMBtu
- -
09 2.2136: Install / repair insulation on steam lines $6,926 $2,087 - - $6,926
-
MMBtu
- -
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $10,204 $4,209 - - $10,204
-
MMBtu
- -
11 2.2135: Repair and eliminate steam leaks $8,793 $1,000 - - $8,515
-
MMBtu
$278
-
Tgal
-
12 2.2121: Increase amount of condensate returned $7,693 $8,950 $46
896
kWh
- $7,035
-
MMBtu
$612
-
Tgal
-
13 2.2121: Increase amount of condensate returned $7,693 $8,950 $46
896
kWh
- $7,035
-
MMBtu
$612
-
Tgal
-
14 2.2136: Install / repair insulation on steam lines $6,826 $1,223 - - $6,826
-
MMBtu
- -
15 2.2691: Shut off cooling if cold outside air will cool process $5,752 - - - $5,752
-
MMBtu
- -
16 2.6211: Conserve energy by efficient use of vending machines $117 - $92
1,700
kWh
$25
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $88,089 $56,598 $16,310
315,336
kWh
$1,673
-
kW-mo/yr
$68,277
-
MMBtu
$1,502
-
Tgal
$327
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs