| Assessment Year | 2008 |
|---|---|
| Principal Product | Rolling Ladder Stands |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
134
ft2
|
| Annual Production | 15,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $110,856 | 1,522,149 |
kWh
|
$0.073 |
| Electricity Demand | $36,670 | 5,360 |
kW-mo/yr
|
$6.84 |
| Natural Gas | $206,948 | 16,845 |
MMBtu
|
$12.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,230 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,987 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $4,117 | $8,400 | - | - |
$4,117
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $3,478 | $513 | - | - |
$3,478
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,322 | $20 |
$1,830
25,126
kWh
|
$492
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,995 | $2,449 |
$1,441
19,790
kWh
|
$554
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,326 | - |
$1,046
14,357
kWh
|
$280
-
kW-mo/yr
|
- | |
| 06 | 2.4151: Develop a repair/replace policy | $1,451 | $1,115 |
$1,205
16,543
kWh
|
$246
-
kW-mo/yr
|
- | |
| 07 | 2.4157: Establish a predictive maintenance program | $1,424 | $1,290 |
$1,205
16,543
kWh
|
$219
-
kW-mo/yr
|
- | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $117 | $206 |
$99
1,357
kWh
|
$18
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $16,230 | $13,993 |
$6,826
93,716
kWh
|
$1,809
-
kW-mo/yr
|
$7,595
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,987 | $5,060 |
$3,950
54,233
kWh
|
$1,037
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs