ITAC Assessment: IC0102
ITAC logo
ITAC Assessment: IC0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corrugate Packaging Materials
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range n/a
# of Employees 50
Plant Area 224,800
ft2
Annual Production 71,959
ton
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,747 4,228,730
kWh
Electricity Demand $42,581 9,743
kW-mo/yr
Electricity Fees $1,114 -
Natural Gas $461,404 67,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1211: Move boiler to more efficient location $39,466 $3,500 - - $39,466
-
MMBtu
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $14,439 $54,000 - - $14,324
-
MMBtu
- - - $115
-
Tgal
03 2.2136: Install / repair insulation on steam lines $9,426 $6,213 - - $9,426
-
MMBtu
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,597 - - - $5,597
-
MMBtu
- - - -
05 2.2135: Repair and eliminate steam leaks $16,902 $2,200 - - $15,207
-
MMBtu
- - - $1,695
-
Tgal
06 2.2121: Increase amount of condensate returned $1,738 $1,200 - - $1,214
-
MMBtu
- - - $524
-
Tgal
07 2.2111: Install steam trap $542 $2,142 - - $542
-
MMBtu
- - - -
08 2.2153: Close off unneeded steam lines $329 $384 - - $329
-
MMBtu
- - - -
09 2.1232: Keep boiler tubes clean $3,862 $776 - - $3,862
-
MMBtu
- - - -
10 2.2414: Use waste heat from hot flue gases to preheat $24,250 $52,000 - - $24,250
-
MMBtu
- - - -
11 2.8118: Check for accuracy of utility / power meters $10,135 $10,152 - - - $10,135
-
Tgal
- - -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,208 $5,000 $7,181
117,720
kWh
$1,027
-
kW-mo/yr
- - - - -
13 2.4231: Reduce the pressure of compressed air to the minimum required $3,019 $220 $2,639
43,262
kWh
$380
-
kW-mo/yr
- - - - -
14 2.6231: Utilize controls to operate equipment only when needed $10,924 $2,500 $9,556
156,660
kWh
$1,368
-
kW-mo/yr
- - - - -
15 2.4224: Upgrade controls on compressors $669 $168 $586
9,600
kWh
$83
-
kW-mo/yr
- - - - -
16 2.7122: Disconnect ballasts $29,539 $2,208 $24,730
405,517
kWh
$3,312
-
kW-mo/yr
- - $467 $1,030 -
TOTAL RECOMMENDED $179,045 $142,663 $44,692
732,759
kWh
$6,170
-
kW-mo/yr
$114,217
-
MMBtu
$10,135
-
Tgal
$467 $1,030 $2,334
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs