ITAC Assessment: IC0086
ITAC logo
ITAC Assessment: IC0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Zinc Die Castings, Chrome Plated Hardware
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 125,000
ft2
Annual Production 175,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $402,298 6,022,548
kWh
Electricity Demand $67,572 16,657
kW-mo/yr
Electricity Fees $50,573 -
Natural Gas $329,849 52,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1133: Adjust burners for efficient operation $59,927 - - - $52,927
-
MMBtu
$7,000
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,538 - - - $3,538
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $4,044 $3,000 - - $4,044
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $7,600 $2,220 - - $7,600
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $1,099 $2,050 - - $1,099
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,738 $43,650 $10,362
191,894
kWh
$11,376
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $9,924 $1,130 $8,064
149,346
kWh
$1,860
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,905 $2,900 $2,361
43,860
kWh
$544
-
kW-mo/yr
- -
TOTAL RECOMMENDED $110,775 $54,950 $20,787
385,100
kWh
$13,780
-
kW-mo/yr
$69,208
-
MMBtu
$7,000
TOTAL IMPLEMENTED $93,251 $51,600 $12,723
235,754
kWh
$11,920
-
kW-mo/yr
$61,608
-
MMBtu
$7,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs