Assessment Year | 2003 |
---|---|
Principal Product | Ground Beef, Bread, Sauces |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | $10 M to 50M |
# of Employees | 179 |
Plant Area |
164,250
ft2
|
Annual Production | 40,375,000
lb
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $207,097 | 6,421,599 |
kWh
|
$0.032 |
Electricity Demand | $178,742 | 13,670 |
kW-mo/yr
|
$13.08 |
Electricity Fees | $29,531 | - |
|
- |
Natural Gas | $181,796 | 35,663 |
MMBtu
|
$5.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.5111: Convert from indirect to direct fired systems | $30,046 | $118,316 | n/a | - | - |
$30,046
-
MMBtu
|
- | - |
02 | 2.2437: Recover waste heat from equipment | $1,893 | $6,541 | n/a | - | - |
$1,893
-
MMBtu
|
- | - |
03 | 2.7261: Install timers and/or thermostats | $1,003 | $398 | n/a | - | - |
$1,003
-
MMBtu
|
- | - |
04 | 2.6218: Turn off equipment when not in use | $1,385 | $2,462 | n/a |
$1,385
38,458
kWh
|
- | - | - | - |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,433 | $1,100 | n/a |
$1,433
39,848
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,391 | $850 | n/a |
$1,391
38,635
kWh
|
- | - | - | - |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,546 | $4,320 | n/a |
$467
12,982
kWh
|
$233
-
kW-mo/yr
|
- | $528 | $318 |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,965 | $40,012 | n/a |
$2,379
68,131
kWh
|
$3,110
-
kW-mo/yr
|
- | $727 | $749 |
09 | 2.7135: Install occupancy sensors | $2,235 | $14,043 | n/a |
$1,759
49,038
kWh
|
$476
-
kW-mo/yr
|
- | - | - |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,554 | $29,500 | n/a |
$3,305
91,813
kWh
|
$2,872
-
kW-mo/yr
|
- | $(-424.0) | $(-199.0) |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $646 | - | n/a |
$409
11,370
kWh
|
$237
-
kW-mo/yr
|
- | - | - |
TOTAL RECOMMENDED | $55,097 | $217,542 |
$12,528
350,275
kWh
|
$7,928
-
kW-mo/yr
|
$32,942
-
MMBtu
|
$831 | $868 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs