| Assessment Year | 2003 |
|---|---|
| Principal Product | Plastic and Aluminum Containers |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 380 |
| Plant Area |
376,000
ft2
|
| Annual Production | 66,000,000
lb
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,324,077 | 25,383,708 |
kWh
|
$0.052 |
| Electricity Demand | $145,778 | 38,978 |
kW-mo/yr
|
$3.74 |
| Electricity Fees | $4,354 | - |
|
- |
| Natural Gas | $167,535 | 44,436 |
MMBtu
|
$3.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $220,561 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $5,571 | $8,423 | n/a |
$5,460
105,000
kWh
|
$111
-
kW-mo/yr
|
- | - |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,454 | $19,501 | n/a |
$13,282
255,427
kWh
|
$1,172
-
kW-mo/yr
|
- | - |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $16,576 | $2,920 | n/a |
$16,166
310,887
kWh
|
$410
-
kW-mo/yr
|
- | - |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $43,869 | $12,078 | n/a |
$39,825
765,953
kWh
|
$4,044
-
kW-mo/yr
|
- | - |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $13,337 | $39,718 | n/a |
$12,580
241,924
kWh
|
$757
-
kW-mo/yr
|
- | - |
| 06 | 2.6232: Install set-back timers | $98,862 | $75,187 | n/a |
$71,940
1,383,266
kWh
|
$26,922
-
kW-mo/yr
|
- | - |
| 07 | 2.7261: Install timers and/or thermostats | $1,972 | $3,710 | n/a | - | - |
$1,972
-
MMBtu
|
- |
| 08 | 2.2437: Recover waste heat from equipment | $7,849 | $14,148 | n/a |
$(-1,176.0)
(-22,628)
kWh
|
$(-242.0)
-
kW-mo/yr
|
$9,267
-
MMBtu
|
- |
| 09 | 2.7243: Improve air circulation with destratification fans / other methods | $18,071 | $78,893 | n/a |
$(-2,334.0)
(-44,878)
kWh
|
$(-480.0)
-
kW-mo/yr
|
$22,145
-
MMBtu
|
$(-1,260.0) |
| TOTAL RECOMMENDED | $220,561 | $254,578 |
$155,743
2,994,951
kWh
|
$32,694
-
kW-mo/yr
|
$33,384
-
MMBtu
|
$(-1,260.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs