ITAC Assessment: NC0011
ITAC logo
ITAC Assessment: NC0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Amino Acids
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,400,000 25,593,201
kWh
Natural Gas $172,000 54,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,817 $2,928 $8,817
180,832
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,210 $21,960 $9,210
160,023
kWh
03 2.2223: Enhance sensitivity of temperature control and cutoff $7,188 $1,760 $7,188
218,054
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $912 $1,200 $912
16,413
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,033 $510 $6,033
182,884
kWh
06 2.4221: Install compressor air intakes in coolest locations $1,045 $300 $1,045
31,653
kWh
TOTAL RECOMMENDED $33,205 $28,658 $33,205
789,859
kWh
TOTAL IMPLEMENTED $15,178 $3,770 $15,178
449,004
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs