ITAC Assessment: LL0209
ITAC logo
ITAC Assessment: LL0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product ship and repair
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 85,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,316 3,765,560
kWh
Electricity Demand $39,436 19,717
kW-mo/yr
Electricity Fees $7,833 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $107,401 $19,500 $104,476
1,664,687
kWh
- $2,925 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,303 $12,640 $12,941
206,197
kWh
- $362 - -
03 2.7134: Use photocell controls $8,552 $882 $8,319
132,560
kWh
- $233 - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,124 $30 $5,957
94,924
kWh
- $167 - -
05 2.7111: Reduce illumination to minimum necessary levels $1,679 $489 $1,405
22,391
kWh
$228
-
kW-mo/yr
$46 - -
06 2.7135: Install occupancy sensors $1,024 $1,080 $996
15,878
kWh
- $28 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $990 $542
8,641
kWh
- $15 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $519 $350 $209
3,329
kWh
- $6 $304 -
09 4.611: Begin a practice of predictive / preventative maintenance $15,200 $2,100 - - - $10,200 $5,000
TOTAL RECOMMENDED $154,359 $38,061 $134,845
2,148,607
kWh
$228
-
kW-mo/yr
$3,782 $10,504 $5,000
TOTAL IMPLEMENTED $138,083 $34,621 $134,094
2,136,637
kWh
$228
-
kW-mo/yr
$3,761 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs