| Assessment Year | 2015 |
|---|---|
| Principal Product | Agricultural Equipment |
| NAICS | 333111: Farm Machinery and Equipment Manufacturing |
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 448 |
| Plant Area |
368,000
ft2
|
| Annual Production | 400
pieces
|
| Production Hrs. Annual | 3,600
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,531 | 1,887,069 |
kWh
|
$0.034 |
| Electricity Demand | $21,239 | 4,428 |
kW-mo/yr
|
$4.80 |
| Natural Gas | $10,397 | 1,837 |
MMBtu
|
$5.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,342 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,685 | $565 |
$2,308
62,901
kWh
|
$377
-
kW-mo/yr
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $2,538 | $12,000 | - | - |
$2,538
-
MMBtu
|
|
| 03 | 2.7442: Keep doors and windows shut when not on use | $2,428 | $3,000 | - | - |
$2,428
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $462 | $278 |
$334
9,102
kWh
|
$128
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $398 | $1,357 |
$398
10,839
kWh
|
- | - | |
| 06 | 2.7261: Install timers and/or thermostats | $119 | $70 | - | - |
$119
-
MMBtu
|
|
| TOTAL RECOMMENDED | $8,630 | $17,270 |
$3,040
82,842
kWh
|
$505
-
kW-mo/yr
|
$5,085
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,342 | $12,635 |
$2,308
62,901
kWh
|
$377
-
kW-mo/yr
|
$2,657
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs