ITAC Assessment: IA0544
ITAC logo
ITAC Assessment: IA0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Agricultural Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 448
Plant Area 368,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,531 1,887,069
kWh
Electricity Demand $21,239 4,428
kW-mo/yr
Natural Gas $10,397 1,837
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,685 $565 $2,308
62,901
kWh
$377
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,538 $12,000 - - $2,538
-
MMBtu
03 2.7442: Keep doors and windows shut when not on use $2,428 $3,000 - - $2,428
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $462 $278 $334
9,102
kWh
$128
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $398 $1,357 $398
10,839
kWh
- -
06 2.7261: Install timers and/or thermostats $119 $70 - - $119
-
MMBtu
TOTAL RECOMMENDED $8,630 $17,270 $3,040
82,842
kWh
$505
-
kW-mo/yr
$5,085
-
MMBtu
TOTAL IMPLEMENTED $5,342 $12,635 $2,308
62,901
kWh
$377
-
kW-mo/yr
$2,657
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs