Assessment Year | 2015 |
---|---|
Principal Product | Grain and feed handling equipment |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
210,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,267 | 2,377,890 |
kWh
|
$0.043 |
Electricity Demand | $130,822 | 7,690 |
kW-mo/yr
|
$17.01 |
Natural Gas | $89,434 | 13,650 |
MMBtu
|
$6.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $12,942 | $244 | - | - |
$12,942
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,348 | $332 |
$1,221
28,600
kWh
|
$1,127
-
kW-mo/yr
|
- | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $5,197 | $20,000 | - | - |
$5,197
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,930 | $2,873 |
$1,520
35,589
kWh
|
$1,410
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,490 | $6,563 |
$1,179
27,619
kWh
|
$1,311
-
kW-mo/yr
|
- | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,368 | $4,943 | - | - |
$1,368
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $1,311 | $480 |
$714
16,633
kWh
|
$597
-
kW-mo/yr
|
- | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $271 | $780 |
$141
3,300
kWh
|
$130
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,857 | $36,215 |
$4,775
111,741
kWh
|
$4,575
-
kW-mo/yr
|
$19,507
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,710 | $10,012 |
$3,920
91,808
kWh
|
$3,848
-
kW-mo/yr
|
$12,942
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs