ITAC Assessment: IA0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Grain and feed handling equipment
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 210,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,267 2,377,890
kWh
Electricity Demand $130,822 7,690
kW-mo/yr
Natural Gas $89,434 13,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $12,942 $244 - - $12,942
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,348 $332 $1,221
28,600
kWh
$1,127
-
kW-mo/yr
-
03 2.2531: Re-size charging openings or add movable cover or door $5,197 $20,000 - - $5,197
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,930 $2,873 $1,520
35,589
kWh
$1,410
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,490 $6,563 $1,179
27,619
kWh
$1,311
-
kW-mo/yr
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $1,368 $4,943 - - $1,368
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,311 $480 $714
16,633
kWh
$597
-
kW-mo/yr
-
08 2.6231: Utilize controls to operate equipment only when needed $271 $780 $141
3,300
kWh
$130
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,857 $36,215 $4,775
111,741
kWh
$4,575
-
kW-mo/yr
$19,507
-
MMBtu
TOTAL IMPLEMENTED $20,710 $10,012 $3,920
91,808
kWh
$3,848
-
kW-mo/yr
$12,942
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs