ITAC Assessment: IA0530
ITAC logo
ITAC Assessment: IA0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Printing
NAICS 323117: Books Printing
SIC 2732: Book Printing
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 49,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,369 908,720
kWh
Electricity Demand $29,089 3,475
kW-mo/yr
Electricity Fees $3,301 -
Natural Gas $4,517 766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,005 $295 - - $1,005
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,399 $133 $2,798
31,556
kWh
$601
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $2,975 $12,786 $2,477
27,992
kWh
$498
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $917 $1,501 $917
10,345
kWh
- -
05 2.7135: Install occupancy sensors $590 $3,040 $590
6,655
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $472 $141 $391
4,417
kWh
$81
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $292 $30 $242
2,730
kWh
$50
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,650 $17,926 $7,415
83,695
kWh
$1,230
-
kW-mo/yr
$1,005
-
MMBtu
TOTAL IMPLEMENTED $9,358 $17,896 $7,173
80,965
kWh
$1,180
-
kW-mo/yr
$1,005
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs