Assessment Year | 2000 |
---|---|
Principal Product | Fuel Injection Nozzles |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
150,000
ft2
|
Annual Production | 416,250
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,619 | 2,271,981 |
kWh
|
$0.032 |
Electricity Demand | $16,135 | 4,788 |
kW-mo/yr
|
$3.37 |
Natural Gas | $2,094 | 424 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,187 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $500 | $58 |
$315
14,361
kWh
|
$185
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $478 | $164 |
$307
13,775
kWh
|
$171
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $128 | $137 |
$79
3,517
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,657 | - |
$1,042
47,186
kWh
|
$615
-
kW-mo/yr
|
- | - | - | |
05 | 3.8142: Distill contaminated solvents for reuse | $7,765 | $16,000 |
$(-32.0)
(-1,465)
kWh
|
$(-68.0)
-
kW-mo/yr
|
- |
$7,865
-
gal
|
- | |
06 | 3.4151: Minimize water usage | $4,559 | $9,800 | - | - |
$4,559
-
Tgal
|
- | - | |
07 | 3.4151: Minimize water usage | $173 | $72 | - | - | - | - | $173 | |
TOTAL RECOMMENDED | $15,260 | $26,231 |
$1,711
77,374
kWh
|
$952
-
kW-mo/yr
|
$4,559
-
Tgal
|
$7,865
-
gal
|
$173 | ||
TOTAL IMPLEMENTED | $5,187 | $9,995 |
$394
17,878
kWh
|
$234
-
kW-mo/yr
|
$4,559
-
Tgal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs