ITAC Assessment: MA0330
ITAC logo
ITAC Assessment: MA0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product polyethylene film
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,750,147 38,640,094
kWh
Natural Gas $606,628 86,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $263,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8211: Consolidate freight shipments and/or deliveries $216,508 - - - $216,508
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,739 $37,200 $23,739
333,529
kWh
- -
03 2.7231: Use radiant heater for spot heating $21,840 $3,800 - $21,840
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $861 - $861
12,016
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $753 $1,930 - $753
-
MMBtu
-
TOTAL RECOMMENDED $263,701 $42,930 $24,600
345,545
kWh
$22,593
-
MMBtu
$216,508
TOTAL IMPLEMENTED $753 $1,930 - $753
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs