ITAC Assessment: IA0512
ITAC logo
ITAC Assessment: IA0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Steel Doors and Frames
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $100
M
to 500
M
# of Employees 625
Plant Area 324,000
ft2
Annual Production 2,775,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,934 7,717,407
kWh
Electricity Demand $305,762 20,235
kW-mo/yr
Electricity Fees $7,292 -
Natural Gas $182,918 40,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $6,448 $356 $3,106
69,842
kWh
$3,342
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,848 $100 $6,820
200,000
kWh
$9,028
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,424 $70 $1,323
38,800
kWh
$1,101
-
kW-mo/yr
-
04 2.2442: Preheat combustion air with waste heat $629 $890 - - $629
-
MMBtu
05 2.2442: Preheat combustion air with waste heat $504 $530 - - $504
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $277 $200 - - $277
-
MMBtu
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $17,286 $135,000 $2,746
80,525
kWh
$14,540
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,415 $137,146 $13,995
389,167
kWh
$28,011
-
kW-mo/yr
$1,409
-
MMBtu
TOTAL IMPLEMENTED $24,997 $726 $11,249
308,642
kWh
$13,471
-
kW-mo/yr
$277
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs