Assessment Year | 2013 |
---|---|
Principal Product | Welded Pipe |
NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
200,000
ft2
|
Annual Production | 250,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $784,754 | 21,666,222 |
kWh
|
$0.036 |
Electricity Demand | $380,653 | 91,166 |
kW-mo/yr
|
$4.18 |
Electricity Fees | $38,881 | - |
|
- |
Natural Gas | $45,318 | 6,831 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $101,252 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $80,219 | $283,479 |
$69,229
1,912,397
kWh
|
$10,990
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,482 | $2,684 |
$1,272
35,212
kWh
|
$210
-
kW-mo/yr
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $5,438 | $549 |
$4,724
130,498
kWh
|
$714
-
kW-mo/yr
|
|
04 | 2.6231: Utilize controls to operate equipment only when needed | $5,088 | $750 |
$5,088
140,540
kWh
|
- | |
05 | 2.6218: Turn off equipment when not in use | $110 | $50 |
$110
3,048
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $4,616 | $30,838 |
$3,895
107,590
kWh
|
$721
-
kW-mo/yr
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,690 | $180 |
$1,439
39,749
kWh
|
$251
-
kW-mo/yr
|
|
08 | 2.4131: Size electric motors for peak operating efficiency | $684 | $870 |
$590
16,293
kWh
|
$94
-
kW-mo/yr
|
|
09 | 2.6218: Turn off equipment when not in use | $1,925 | $425 |
$1,925
53,188
kWh
|
- | |
TOTAL RECOMMENDED | $101,252 | $319,825 |
$88,272
2,438,515
kWh
|
$12,980
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $101,252 | $319,825 |
$88,272
2,438,515
kWh
|
$12,980
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs