| Assessment Year | 2003 |
|---|---|
| Principal Product | Automotive Filters and Regulators |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 2,360 |
| Plant Area |
106,321
ft2
|
| Annual Production | 2,700,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,889 | 3,981,600 |
kWh
|
$0.032 |
| Electricity Demand | $51,926 | 9,013 |
kW-mo/yr
|
$5.76 |
| Natural Gas | $102,052 | 14,259 |
MMBtu
|
$7.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,310 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $107 | $145 |
$45
2,170
kWh
|
$62
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,948 | $254 |
$808
39,205
kWh
|
$1,140
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $327 | $71 |
$84
4,081
kWh
|
$243
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,591 | $17,302 |
$2,733
132,669
kWh
|
$3,858
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $636 | $827 |
$265
12,847
kWh
|
$371
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $120 | $333 |
$120
5,844
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $446 | $1,365 | - | - |
$446
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $572 | $1,552 |
$572
27,786
kWh
|
- | - | |
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $1,701 | $23,701 |
$707
34,300
kWh
|
$994
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $12,448 | $45,550 |
$5,334
258,902
kWh
|
$6,668
-
kW-mo/yr
|
$446
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,310 | $42,300 |
$4,642
225,272
kWh
|
$6,668
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs