ITAC Assessment: TN0320
ITAC logo
ITAC Assessment: TN0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FORMING FABRICS
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 1,500
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,665 9,791,911
kWh
Natural Gas $128,177 24,881
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $16,448 $3,192 - $16,448
-
MMBtu
02 2.5194: Redesign process $11,356 $26,320 - $11,356
-
MMBtu
03 2.2153: Close off unneeded steam lines $4,280 - - $4,280
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,392 $800 - $2,392
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,300 $210 $4,300
95,545
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,864 - $3,864
85,873
kWh
-
07 2.2437: Recover waste heat from equipment $1,175 $1,180 - $1,175
-
MMBtu
08 2.6232: Install set-back timers $1,424 - $1,424
31,653
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,434 $864 $5,434
120,750
kWh
-
TOTAL RECOMMENDED $50,673 $32,566 $15,022
333,821
kWh
$35,651
-
MMBtu
TOTAL IMPLEMENTED $35,037 $6,246 $15,022
333,821
kWh
$20,015
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs