Assessment Year | 1987 |
---|---|
Principal Product | FORMING FABRICS |
NAICS |
n/a
|
SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
Sales Range | $10 M to 50M |
# of Employees | 155 |
Plant Area |
n/a
|
Annual Production | 1,500
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $440,665 | 9,791,911 |
kWh
|
$0.045 |
Natural Gas | $128,177 | 24,881 |
MMBtu
|
$5.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,037 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $16,448 | $3,192 | - |
$16,448
-
MMBtu
|
|
02 | 2.5194: Redesign process | $11,356 | $26,320 | - |
$11,356
-
MMBtu
|
|
03 | 2.2153: Close off unneeded steam lines | $4,280 | - | - |
$4,280
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,392 | $800 | - |
$2,392
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,300 | $210 |
$4,300
95,545
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,864 | - |
$3,864
85,873
kWh
|
- | |
07 | 2.2437: Recover waste heat from equipment | $1,175 | $1,180 | - |
$1,175
-
MMBtu
|
|
08 | 2.6232: Install set-back timers | $1,424 | - |
$1,424
31,653
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,434 | $864 |
$5,434
120,750
kWh
|
- | |
TOTAL RECOMMENDED | $50,673 | $32,566 |
$15,022
333,821
kWh
|
$35,651
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,037 | $6,246 |
$15,022
333,821
kWh
|
$20,015
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs