ITAC Assessment: IA0268
ITAC logo
ITAC Assessment: IA0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product plastic bucket containers & lids
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 80,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $595,888 17,647,000
kWh
Electricity Demand $162,626 32,520
kW-mo/yr
Natural Gas $28,396 3,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $941,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $344,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.8121: Apply for tax-free status for energy purchases $44,140 $200 - - - - $44,140 -
02 2.3212: Optimize plant power factor $16,943 $34,265 - - $16,943 - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,481 $120 $5,952
216,431
kWh
$2,529
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $2,757 $155 $1,930
70,190
kWh
$827
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $524 $55 $368
13,392
kWh
$156
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,626 $7,637 $1,396
50,763
kWh
$1,230
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,233 $804 - $2,233
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,607 $2,580 $989
35,953
kWh
$618
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $471 $791 $471
17,127
kWh
- - - - -
10 2.4133: Use most efficient type of electric motors $836 $145 $584
21,222
kWh
$252
-
kW-mo/yr
- - - -
11 3.7134: Wash and reuse rags on-site $18,352 $108 - - - $18,352
-
lb
- -
12 2.7229: Air condition only space necessary $482,780 $42,000 - - - - - $482,780
13 4.446: Automate finishing process $285,120 $140,000 - - - - - $285,120
14 4.446: Automate finishing process $58,660 $35,260 n/a - - - - - $58,660
15 4.322: Eliminate old stock and modify inventory control $15,840 $78,673 n/a - - - - - $15,840
TOTAL RECOMMENDED $941,370 $342,793 $11,690
425,078
kWh
$7,845
-
kW-mo/yr
$16,943 $18,352
-
lb
$44,140 $842,400
TOTAL IMPLEMENTED $344,338 $143,859 $8,871
322,574
kWh
$6,207
-
kW-mo/yr
- - $44,140 $285,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs