ITAC Assessment: CO0521
ITAC logo
ITAC Assessment: CO0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Biopharmaceuticals
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range greater than $500
M
# of Employees 400
Plant Area 628,100
ft2
Annual Production 15,435
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,498,721 36,786,782
kWh
Natural Gas $825,538 142,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2628: Utilize a less expensive cooling method $65,190 $82,000 $65,190
1,694,000
kWh
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,840 $5,100 $2,840
73,900
kWh
- - - -
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,010 $1,400 - $2,010
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,000 $200 $2,360
61,400
kWh
- - $(-360.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,650 $3,532 $2,150
55,888
kWh
- - - $(-500.0)
06 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $48,290 $175,000 $8,260
214,700
kWh
$3,790
-
MMBtu
$36,240
-
gal
- -
TOTAL RECOMMENDED $121,980 $267,232 $80,800
2,099,888
kWh
$5,800
-
MMBtu
$36,240
-
gal
$(-360.0) $(-500.0)
TOTAL IMPLEMENTED $4,010 $1,600 $2,360
61,400
kWh
$2,010
-
MMBtu
- $(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs