ITAC Assessment: IA0197
ITAC logo
ITAC Assessment: IA0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product folding cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 80,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,507 7,850,821
kWh
Electricity Demand $114,222 18,456
kW-mo/yr
Natural Gas $58,211 14,078
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $474,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.446: Automate finishing process $234,000 $280,000 n/a - - - - $234,000 -
02 4.441: Install automatic packing equipment $185,000 $340,000 n/a - - - - $185,000 -
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $22,403 $27,855 n/a - - $22,403
-
MMBtu
- - -
04 2.8113: Purchase gas directly from a contract gas supplier $9,995 $4,200 n/a - - - - - $9,995
05 3.5315: Lease / purchase baler; sell cardboard to recycler $8,880 - n/a - - - $8,880
-
lb
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,626 $25 n/a $3,875
148,007
kWh
$1,751
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,902 $13,293 n/a $2,351
89,683
kWh
$1,551
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,437 $4,274 n/a $1,676
63,892
kWh
$761
-
kW-mo/yr
- - - -
09 2.4221: Install compressor air intakes in coolest locations $1,886 $200 n/a $1,295
48,945
kWh
$591
-
kW-mo/yr
- - - -
10 2.7135: Install occupancy sensors $667 $931 n/a $667
25,498
kWh
- - - - -
TOTAL RECOMMENDED $474,796 $670,778 $9,864
376,025
kWh
$4,654
-
kW-mo/yr
$22,403
-
MMBtu
$8,880
-
lb
$419,000 $9,995
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs