ITAC Assessment: CO0552
ITAC logo
ITAC Assessment: CO0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Wireless communication components
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $747,506 19,324,800
kWh
Electricity Demand $281,154 30,888
kW-mo/yr
Electricity Fees $69,787 -
Natural Gas $159,712 27,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $47,960 $7,780 $34,220
902,200
kWh
$13,740
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,570 $620 $5,400
142,400
kWh
$2,170
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,520 $270 $3,940
103,900
kWh
$1,580
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $834 $560 $595
15,709
kWh
$239
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,500 $3,050 $1,070
28,100
kWh
$430
-
kW-mo/yr
- - -
06 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $14,250 $71,200 $10,500
286,900
kWh
$3,750
-
kW-mo/yr
- - -
07 3.4115: Recover and reuse cooling water $4,170 $20,000 - $(-820.0)
-
kW-mo/yr
$1,990
-
Tgal
$(-480.0) $3,480
-
Tgal
08 2.7135: Install occupancy sensors $950 $2,800 $860
22,800
kWh
$90
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $82,754 $106,280 $56,585
1,502,009
kWh
$21,179
-
kW-mo/yr
$1,990
-
Tgal
$(-480.0) $3,480
-
Tgal
TOTAL IMPLEMENTED $9,904 $4,230 $7,065
186,209
kWh
$2,839
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs