Assessment Year | 1995 |
---|---|
Principal Product | cheese and ice cream mix |
NAICS |
n/a
|
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
167,000
ft2
|
Annual Production | 52,900,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,236,549 | 19,407,679 |
kWh
|
$0.064 |
Natural Gas | $503,678 | 208,605 |
MMBtu
|
$2.41 |
Fuel Oil #2 | $1,440 | 444 |
MMBtu
|
$3.24 |
Fuel Oil #6 | $4,933 | 2,187 |
MMBtu
|
$2.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $5,455 | $1,500 | - |
$5,455
-
MMBtu
|
|
02 | 2.7135: Install occupancy sensors | $9,634 | $3,778 |
$9,634
151,231
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,078 | $5,608 |
$2,078
32,532
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,165 | $533 |
$1,165
18,171
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $185 | $375 |
$185
2,931
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $997 | $25 |
$997
15,533
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,699 | $5,004 |
$1,699
26,671
kWh
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $719 | $1,060 |
$719
11,430
kWh
|
- | |
09 | 2.7444: Close holes and openings in building such as broken windows | $1,368 | $1,740 |
$1,368
21,395
kWh
|
- | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $551 | $60 |
$551
8,792
kWh
|
- | |
11 | 2.2511: Insulate bare equipment | $398 | $410 | - |
$398
-
MMBtu
|
|
12 | 2.2691: Shut off cooling if cold outside air will cool process | $1,440 | $5,725 |
$1,440
22,567
kWh
|
- | |
13 | 2.7261: Install timers and/or thermostats | $256 | $130 |
$250
3,810
kWh
|
$6
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,945 | $25,948 |
$20,086
315,063
kWh
|
$5,859
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,660 | $21,605 |
$9,205
144,489
kWh
|
$5,455
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs