ITAC Assessment: WI0012
ITAC logo
ITAC Assessment: WI0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product EXPANDED METAL
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,272 1,242,087
kWh
Natural Gas $62,335 13,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $9,609 - $9,609
98,476
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,160 - $4,160
42,497
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $246 $669 $246
2,638
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,335 $2,000 $1,335
13,775
kWh
05 2.3191: Use demand controller or load shedder $2,508 $5,000 $2,508
-
kWh
TOTAL RECOMMENDED $17,858 $7,669 $17,858
157,386
kWh
TOTAL IMPLEMENTED $5,741 $2,669 $5,741
58,910
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs