ITAC Assessment: IC0116
ITAC logo
ITAC Assessment: IC0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product door modules
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 142
Plant Area 65,000
ft2
Annual Production 1,077,600
pieces
Production Hrs. Annual 4,144
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,048 981,021
kWh
Electricity Demand $29,287 2,393
kW-mo/yr
Electricity Fees $240 -
Natural Gas $96,202 8,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $3,603 $6,000 - - $3,603
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $3,321 $1,100 $2,468
52,560
kWh
$853
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $294 - $221
4,703
kWh
$73
-
kW-mo/yr
- - -
04 2.7261: Install timers and/or thermostats $15,127 $218 - - $15,127
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $4,114 - - - $4,114
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $325 $274 $161
3,416
kWh
$61
-
kW-mo/yr
- $53 $50
TOTAL RECOMMENDED $26,784 $7,592 $2,850
60,679
kWh
$987
-
kW-mo/yr
$22,844
-
MMBtu
$53 $50
TOTAL IMPLEMENTED $26,165 $7,318 $2,468
52,560
kWh
$853
-
kW-mo/yr
$22,844
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings