Assessment Year | 1994 |
---|---|
Principal Product | polypropylene bailing twine |
NAICS |
n/a
|
SIC | 2298: Cordage and Twine |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
62,100
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $632,470 | 12,725,674 |
kWh
|
$0.050 |
Natural Gas | $1,827 | 348 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,029 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,536 | $35,000 |
$13,536
272,274
kWh
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,382 | $1,881 |
$4,382
88,218
kWh
|
|
03 | 2.2511: Insulate bare equipment | $3,764 | $1,000 |
$3,764
28,136
kWh
|
|
04 | 2.7261: Install timers and/or thermostats | $1,920 | $910 |
$1,920
39,273
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $567 | $70 |
$567
11,430
kWh
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $509 | $25 |
$509
10,258
kWh
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $487 | $25 |
$487
9,672
kWh
|
|
08 | 2.4226: Use / purchase optimum sized compressor | $483 | $13 |
$483
9,672
kWh
|
|
09 | 2.4221: Install compressor air intakes in coolest locations | $1,190 | $1,755 |
$1,190
24,033
kWh
|
|
TOTAL RECOMMENDED | $26,838 | $40,679 |
$26,838
492,966
kWh
|
||
TOTAL IMPLEMENTED | $9,029 | $4,654 |
$9,029
182,298
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs