ITAC Assessment: IA0097
ITAC logo
ITAC Assessment: IA0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product canned ham
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 120,000
ft2
Annual Production 116,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $462,936 8,647,128
kWh
Natural Gas $242,853 94,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4321: Upgrade obsolete equipment $146,835 $367,000 $146,835
2,742,966
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,716 $4,000 $18,716
349,648
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,939 $355 $1,939
36,342
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,091 $3,634 $8,091
151,231
kWh
-
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,272 $1,686 $2,272
42,497
kWh
-
06 2.7261: Install timers and/or thermostats $6,851 $995 $6,851
128,077
kWh
-
07 2.1213: Direct warmest air to combustion intake $2,661 $1,200 - $2,661
-
MMBtu
08 2.2511: Insulate bare equipment $144 $313 - $144
-
MMBtu
TOTAL RECOMMENDED $187,509 $379,183 $184,704
3,450,761
kWh
$2,805
-
MMBtu
TOTAL IMPLEMENTED $23,316 $5,555 $20,655
385,990
kWh
$2,661
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs