| Assessment Year | 1994 |
|---|---|
| Principal Product | canned ham |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $100 M to 500M |
| # of Employees | 230 |
| Plant Area |
120,000
ft2
|
| Annual Production | 116,000,000
lb
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $462,936 | 8,647,128 |
kWh
|
$0.054 |
| Natural Gas | $242,853 | 94,648 |
MMBtu
|
$2.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $187,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,316 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $146,835 | $367,000 |
$146,835
2,742,966
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,716 | $4,000 |
$18,716
349,648
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,939 | $355 |
$1,939
36,342
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,091 | $3,634 |
$8,091
151,231
kWh
|
- | |
| 05 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,272 | $1,686 |
$2,272
42,497
kWh
|
- | |
| 06 | 2.7261: Install timers and/or thermostats | $6,851 | $995 |
$6,851
128,077
kWh
|
- | |
| 07 | 2.1213: Direct warmest air to combustion intake | $2,661 | $1,200 | - |
$2,661
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $144 | $313 | - |
$144
-
MMBtu
|
|
| TOTAL RECOMMENDED | $187,509 | $379,183 |
$184,704
3,450,761
kWh
|
$2,805
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,316 | $5,555 |
$20,655
385,990
kWh
|
$2,661
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs