Assessment Year | 1994 |
---|---|
Principal Product | catalogues and brochures |
NAICS |
n/a
|
SIC | 2721: Periodicals: Publishing, or Publishing and Printing |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
150,000
ft2
|
Annual Production | 8,700,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,142 | 4,207,796 |
kWh
|
$0.044 |
Natural Gas | $35,962 | 8,025 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,622 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $4,503 | $1,050 |
$4,503
101,114
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $4,679 | $4,728 |
$4,679
105,217
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,130 | $917 |
$4,130
92,907
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $876 | $1,155 |
$876
19,637
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $492 | $1,596 |
$492
11,137
kWh
|
- | |
06 | 2.5121: Redesign flow to minimize mass transfer length | $3,961 | $14,000 |
$3,961
89,097
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,345 | $170 |
$2,345
52,755
kWh
|
- | |
08 | 2.7261: Install timers and/or thermostats | $1,407 | $1,950 |
$685
15,533
kWh
|
$722
-
MMBtu
|
|
09 | 2.4239: Eliminate or reduce compressed air usage | $769 | $1,750 |
$769
17,292
kWh
|
- | |
10 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $282 | $276 |
$282
12,603
kWh
|
- | |
11 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $147 | $75 |
$147
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $23,591 | $27,667 |
$22,869
520,516
kWh
|
$722
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,622 | $2,513 |
$4,622
104,044
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |