ITAC Assessment: SD0194
ITAC logo
ITAC Assessment: SD0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product PCB Containers, and Heat Sinks
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 80,000
ft2
Annual Production 75,000
thousand feet
Production Hrs. Annual 3,850
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,958 1,482,708
kWh
Electricity Demand $44,350 5,016
kW-mo/yr
Natural Gas $4,435 608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,625 $5,210 $2,518
31,067
kWh
$1,107
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,551 $10,500 $17,963
221,864
kWh
$3,629
-
kW-mo/yr
$(-1,041.0)
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $2,430 $450 $1,538
19,050
kWh
$892
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $706 $1,150 $527
6,448
kWh
$179
-
kW-mo/yr
- -
05 2.2515: Use optimum thickness insulation $2,213 $1,559 - $561
-
kW-mo/yr
$1,652
-
MMBtu
-
06 2.7144: Install spectral reflectors / delamp $3,975 $7,590 $2,494
30,774
kWh
$1,481
-
kW-mo/yr
- -
07 3.5242: Recover metals from spent solutions and recycle $2,400 $1,000 - - - $2,400
08 3.2171: Use an automatic plate processor $4,590 $1,000 - - - $4,590
TOTAL RECOMMENDED $40,490 $28,459 $25,040
309,203
kWh
$7,849
-
kW-mo/yr
$611
-
MMBtu
$6,990
TOTAL IMPLEMENTED $11,374 $9,369 $4,583
56,565
kWh
$2,739
-
kW-mo/yr
$1,652
-
MMBtu
$2,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs