Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Oil field equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,542 400,809
kWh
Electricity Demand $27,088 4,820
kW-mo/yr
Electricity Fees $3,437 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $19,102 $30 $10,188
232,752
kWh
$7,548
-
kW-mo/yr
$1,366 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,439 $30 $1,336
30,530
kWh
- $103 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,042 $2,920 $1,896
43,323
kWh
- $146 -
04 2.7111: Reduce illumination to minimum necessary levels $1,020 $990 $587
13,420
kWh
$360
-
kW-mo/yr
$73 -
05 2.4222: Install adequate dryers on air lines to eliminate blowdown $745 $152 $692
15,812
kWh
- $53 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $323 $245 $102
2,330
kWh
- $8 $213
07 4.611: Begin a practice of predictive / preventative maintenance $1,500 $30 - - - $1,500
TOTAL RECOMMENDED $26,171 $4,397 $14,801
338,167
kWh
$7,908
-
kW-mo/yr
$1,749 $1,713
TOTAL IMPLEMENTED $24,732 $4,367 $13,465
307,637
kWh
$7,908
-
kW-mo/yr
$1,646 $1,713
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs