ITAC Assessment: IA0093
ITAC logo
ITAC Assessment: IA0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product doors and windows
NAICS
n/a
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 475,000
ft2
Annual Production 299,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,857 6,096,718
kWh
Natural Gas $33,584 9,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,269 $9,543 $12,269
269,637
kWh
-
02 2.7134: Use photocell controls $1,868 $443 $1,868
41,032
kWh
-
03 2.7135: Install occupancy sensors $476 $1,267 $476
10,551
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $10,114 $28,000 - $10,114
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,761 $12,000 $7,761
170,574
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,578 $50 $6,578
144,490
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,400 $263 $4,400
96,424
kWh
-
08 2.3212: Optimize plant power factor $2,946 $7,290 $2,946
-
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,515 $2,539 $1,515
33,118
kWh
-
10 2.7261: Install timers and/or thermostats $321 $130 $321
11,723
kWh
-
TOTAL RECOMMENDED $48,248 $61,525 $38,134
777,549
kWh
$10,114
-
MMBtu
TOTAL IMPLEMENTED $25,591 $11,566 $25,591
562,134
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs