ITAC Assessment: UM0085
ITAC logo
ITAC Assessment: UM0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steering Components
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area 75,251
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,040
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,807 1,446,366
kWh
Electricity Demand $71,561 4,248
kW-mo/yr
Electricity Fees $1,333 -
Natural Gas $71,099 7,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $570 $907 $243
8,206
kWh
$327
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,163 $5,109 $735
24,912
kWh
$1,428
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,967 $600 $1,265
42,790
kWh
$1,702
-
kW-mo/yr
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $1,420 $4,000 - - $1,420
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $10,164 - - - - $10,164
-
lb
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $108,607 - - - - $108,607
-
lb
-
07 4.321: Optimize production lot sizes and inventories $12,726 - - - - - $12,726
TOTAL RECOMMENDED $138,617 $10,616 $2,243
75,908
kWh
$3,457
-
kW-mo/yr
$1,420
-
MMBtu
$118,771
-
lb
$12,726
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs