ITAC Assessment: IC0183
ITAC logo
ITAC Assessment: IC0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Food
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 126,800
ft2
Annual Production 30,608,773
lb
Production Hrs. Annual 4,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,763 1,998,200
kWh
Electricity Demand $31,010 6,720
kW-mo/yr
Electricity Fees $2,700 -
Natural Gas $1,504 181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,319 - $3,042
35,366
kWh
$404
-
kW-mo/yr
- - $171 $(-298.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $160 $503 $144
1,680
kWh
$18
-
kW-mo/yr
- $2 - $(-4.0)
03 2.7135: Install occupancy sensors $328 $2,003 $271
3,152
kWh
$57
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,540 $81,305 $12,793
148,760
kWh
$1,578
-
kW-mo/yr
- $246 - $(-77.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,481 $43,841 $9,416
109,484
kWh
$1,161
-
kW-mo/yr
- $42 - $862
06 2.7142: Utilize higher efficiency lamps and/or ballasts $182 $426 $145
1,682
kWh
$11
-
kW-mo/yr
- - - $26
07 2.4231: Reduce the pressure of compressed air to the minimum required $363 - $363
4,225
kWh
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $1,035 $570
6,629
kWh
- - - - -
09 2.7224: Reduce space conditioning during non-working hours $17 - - - $17
-
MMBtu
- - -
TOTAL RECOMMENDED $30,960 $129,113 $26,744
310,978
kWh
$3,229
-
kW-mo/yr
$17
-
MMBtu
$290 $171 $509
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs