ITAC Assessment: IA0072
ITAC logo
ITAC Assessment: IA0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PROCESSED HAM
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area
n/a
Annual Production 101,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,684 9,012,896
kWh
Natural Gas $204,373 75,241
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $90,934 $267,950 $111,958
2,696,366
kWh
$(-23,224.0)
-
MMBtu
$2,200
02 2.2621: Modify refrigeration system to operate at a lower pressure $42,651 $56,888 $42,651
882,181
kWh
- -
03 2.4133: Use most efficient type of electric motors $10,851 $4,308 $10,851
224,502
kWh
- -
04 2.2511: Insulate bare equipment $1,822 $7,616 - $1,822
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,747 $20 $1,250
25,791
kWh
$497
-
MMBtu
-
06 2.1213: Direct warmest air to combustion intake $585 $500 - $585
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $3,637 $1,000 $3,637
75,322
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $2,476 $200 $2,476
51,290
kWh
- -
09 2.7135: Install occupancy sensors $1,037 - $1,689
34,877
kWh
- $(-652.0)
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,188 $1,430 $1,188
24,619
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $903 $360 $903
18,757
kWh
- -
TOTAL RECOMMENDED $157,831 $340,272 $176,603
4,033,705
kWh
$(-20,320.0)
-
MMBtu
$1,548
TOTAL IMPLEMENTED $21,570 $13,144 $19,903
411,782
kWh
$2,319
-
MMBtu
$(-652.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs