ITAC Assessment: IA0066
ITAC logo
ITAC Assessment: IA0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product RADIOS, MONITORS, RECVRS
NAICS
n/a
SIC 3651: Household Audio and Video Equipment
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 58,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,979 1,358,148
kWh
Natural Gas $32,110 7,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $9,150 $37 $1,862
28,429
kWh
$7,288
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,786 - $2,171
33,118
kWh
- $(-385.0)
03 2.7111: Reduce illumination to minimum necessary levels $2,131 $790 $2,131
32,532
kWh
- -
04 2.7122: Disconnect ballasts $1,389 $4,530 $1,389
21,102
kWh
- -
05 2.7135: Install occupancy sensors $752 $1,404 $752
11,430
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,484 $25 $1,484
22,567
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $713 $360 $713
10,844
kWh
- -
08 2.2437: Recover waste heat from equipment $1,889 $4,427 $(-288.0)
(-4,396)
kWh
$2,177
-
MMBtu
-
09 2.3132: Recharge batteries on during off-peak demand periods $865 - $865
-
kWh
- -
10 2.4133: Use most efficient type of electric motors $25 $50 $25
293
kWh
- -
TOTAL RECOMMENDED $20,184 $11,623 $11,104
155,919
kWh
$9,465
-
MMBtu
$(-385.0)
TOTAL IMPLEMENTED $13,285 $62 $6,382
84,114
kWh
$7,288
-
MMBtu
$(-385.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs