ITAC Assessment: IA0055
ITAC logo
ITAC Assessment: IA0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product bagels
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,001 1,769,930
kWh
Natural Gas $91,777 18,630
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $34,465 $4,200 - $34,465
-
MMBtu
02 2.8121: Apply for tax-free status for energy purchases $4,167 $250 - $4,167
-
MMBtu
03 2.8123: Pay utility bills on time $1,212 $568 $1,212
-
kWh
-
04 2.2692: Use outside cold water source as a supply of cooling water $11,960 $31,875 $11,960
55,979
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $12,814 $1,000 - $12,814
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $3,528 $1,900 $3,528
59,496
kWh
-
07 2.4133: Use most efficient type of electric motors $391 $3,325 $391
6,741
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $770 $201 $770
12,896
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,096 $2,093 $1,096
18,464
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $609 $870 $609
10,258
kWh
-
11 2.7135: Install occupancy sensors $601 $1,050 $601
10,258
kWh
-
12 2.4221: Install compressor air intakes in coolest locations $430 $189 $430
7,327
kWh
-
13 2.7261: Install timers and/or thermostats $195 $300 - $195
-
MMBtu
TOTAL RECOMMENDED $72,238 $47,821 $20,597
181,419
kWh
$51,641
-
MMBtu
TOTAL IMPLEMENTED $53,819 $9,544 $2,373
19,637
kWh
$51,446
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs