Assessment Year | 1993 |
---|---|
Principal Product | plastic bottles and cleaner |
NAICS |
n/a
|
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
60,000
ft2
|
Annual Production | 13,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,983 | 1,817,995 |
kWh
|
$0.064 |
Natural Gas | $6,326 | 1,649 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,044 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,020 | $50 |
$2,020
31,653
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,060 | $150 |
$1,060
16,706
kWh
|
- | |
03 | 2.2624: Use cold waste water to cool chiller feed water | $1,563 | $3,800 |
$1,563
24,619
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $942 | $125 |
$942
14,654
kWh
|
- | |
05 | 2.7441: Replace broken windows and/or window sash | $22 | $20 | - |
$22
-
MMBtu
|
|
TOTAL RECOMMENDED | $5,607 | $4,145 |
$5,585
87,632
kWh
|
$22
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,044 | $345 |
$4,022
63,013
kWh
|
$22
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs