ITAC Assessment: IA0046
ITAC logo
ITAC Assessment: IA0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product plastic bottles and cleaner
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 60,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,983 1,817,995
kWh
Natural Gas $6,326 1,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,020 $50 $2,020
31,653
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,060 $150 $1,060
16,706
kWh
-
03 2.2624: Use cold waste water to cool chiller feed water $1,563 $3,800 $1,563
24,619
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $942 $125 $942
14,654
kWh
-
05 2.7441: Replace broken windows and/or window sash $22 $20 - $22
-
MMBtu
TOTAL RECOMMENDED $5,607 $4,145 $5,585
87,632
kWh
$22
-
MMBtu
TOTAL IMPLEMENTED $4,044 $345 $4,022
63,013
kWh
$22
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs