| Assessment Year | 1992 |
|---|---|
| Principal Product | GYPSUM PRODUCTS |
| NAICS |
n/a
|
| SIC | 3275: Gypsum Products |
| Sales Range | $1 M to 5M |
| # of Employees | 43 |
| Plant Area |
n/a
|
| Annual Production | 550,000
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $237,185 | 5,390,973 |
kWh
|
$0.044 |
| Natural Gas | $817,161 | 351,908 |
MMBtu
|
$2.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,707 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1213: Direct warmest air to combustion intake | $25,018 | $6,000 | - |
$25,018
-
MMBtu
|
- | |
| 02 | 2.2441: Preheat boiler makeup water with waste process heat | $11,110 | $3,925 | - |
$11,110
-
MMBtu
|
- | |
| 03 | 2.1213: Direct warmest air to combustion intake | $939 | $250 | - |
$939
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,478 | $9,905 |
$3,478
79,132
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,328 | $150 |
$1,328
30,188
kWh
|
- | - | |
| 06 | 2.6232: Install set-back timers | $3,181 | $2,376 |
$3,181
72,392
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $619 | $1,575 |
$619
14,068
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $241 | $185 |
$426
9,672
kWh
|
- | $(-185.0) | |
| TOTAL RECOMMENDED | $45,914 | $24,366 |
$9,032
205,452
kWh
|
$37,067
-
MMBtu
|
$(-185.0) | ||
| TOTAL IMPLEMENTED | $30,707 | $8,961 |
$4,935
112,252
kWh
|
$25,957
-
MMBtu
|
$(-185.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs