ITAC Assessment: IA0037
ITAC logo
ITAC Assessment: IA0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ANIMAL VACCINES
NAICS
n/a
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 472
Plant Area
n/a
Annual Production 79,000,000
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $745,903 16,745,311
kWh
Natural Gas $434,556 103,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $37,186 $40,120 $(-1,728.0)
(-38,687)
kWh
$38,914
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $23,697 $2,500 - $23,697
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $3,475 $2,628 - $3,475
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,383 $600 $2,383
53,634
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,117 $600 $688
15,240
kWh
$429
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,046 $3,050 $1,046
23,447
kWh
-
TOTAL RECOMMENDED $68,904 $49,498 $2,389
53,634
kWh
$66,515
-
MMBtu
TOTAL IMPLEMENTED $24,743 $5,550 $1,046
23,447
kWh
$23,697
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs