ITAC Assessment: WI0311
ITAC logo
ITAC Assessment: WI0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Drilling and Hammer Accessories
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 102,790
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,187 2,203,107
kWh
Electricity Demand $204,591 14,616
kW-mo/yr
Electricity Fees $10,034 -
Natural Gas $124,640 34,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,098 $40,000 $5,847
133,060
kWh
$14,804
-
kW-mo/yr
$(-5,553.0)
-
MMBtu
-
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,699 $5,024 $702
16,120
kWh
$997
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,492 $7,504 $1,858
42,204
kWh
$2,634
-
kW-mo/yr
- -
04 3.3122: Use filtration, centrifuging to remove contaminants $3,414 $7,000 - - - $3,414
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,196 - - $2,196
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $548 $532 - - $548
-
MMBtu
-
TOTAL RECOMMENDED $27,447 $60,060 $8,407
191,384
kWh
$20,631
-
kW-mo/yr
$(-5,005.0)
-
MMBtu
$3,414
TOTAL IMPLEMENTED $4,492 $7,504 $1,858
42,204
kWh
$2,634
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs