ITAC Assessment: OR0733
ITAC logo
ITAC Assessment: OR0733
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Hazelnuts, Walnuts
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 40,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 1,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,430 132,600
kWh
LPG $33,658 3,350
MMBtu
TOTAL YEARLY COSTS $51,088
RECOMMENDED SAVINGS* $35,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status LPG Savings By-product Production Savings
01 2.9141: Install anaerobic digester $30,707 $224,950 $33,668
-
MMBtu
$(-2,961.0)
02 2.2211: Use optimum temperature $3,294 $5,000 $3,294
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,400 $4,362 $1,400
-
MMBtu
-
TOTAL RECOMMENDED $35,401 $234,312 $38,362
-
MMBtu
$(-2,961.0)
TOTAL IMPLEMENTED $3,294 $5,000 $3,294
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs