ITAC Assessment: IA0033
ITAC logo
ITAC Assessment: IA0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product NEWSPAPERS
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 8,100,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,447 1,826,495
kWh
Natural Gas $27,676 7,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $521 $136 $714
14,947
kWh
$(-193.0)
02 2.6232: Install set-back timers $1,188 $1,197 $1,188
24,912
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $160 $104
2,052
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $100 $940
19,637
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $238 $200 $238
4,982
kWh
-
TOTAL RECOMMENDED $2,991 $1,793 $3,184
66,530
kWh
$(-193.0)
TOTAL IMPLEMENTED $1,565 $396 $1,758
36,636
kWh
$(-193.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs