| Assessment Year | 1992 |
|---|---|
| Principal Product | CORRUGATED PAPER |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 800,000
thousand feet
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $284,468 | 5,401,231 |
kWh
|
$0.053 |
| Natural Gas | $256,903 | 76,083 |
MMBtu
|
$3.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $128,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $90,911 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $83,615 | $95,000 | - |
$83,615
-
MMBtu
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $12,000 | $482 | - |
$12,000
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,915 | $1,500 | - |
$9,915
-
MMBtu
|
- | |
| 04 | 2.1222: Install turbulators | $2,572 | $4,270 | - |
$2,572
-
MMBtu
|
- | |
| 05 | 2.1213: Direct warmest air to combustion intake | $2,572 | $300 | - |
$2,572
-
MMBtu
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $2,079 | $100 |
$2,079
39,566
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,217 | $331 |
$5,492
104,338
kWh
|
- | $(-275.0) | |
| 08 | 2.6232: Install set-back timers | $5,917 | $10,125 |
$5,917
112,544
kWh
|
- | - | |
| 09 | 2.6232: Install set-back timers | $3,762 | $3,699 |
$3,762
71,512
kWh
|
- | - | |
| 10 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $946 | $1,800 |
$946
17,878
kWh
|
- | - | |
| TOTAL RECOMMENDED | $128,595 | $117,607 |
$18,196
345,838
kWh
|
$110,674
-
MMBtu
|
$(-275.0) | ||
| TOTAL IMPLEMENTED | $90,911 | $95,431 |
$7,571
143,904
kWh
|
$83,615
-
MMBtu
|
$(-275.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs