ITAC Assessment: IA0028
ITAC logo
ITAC Assessment: IA0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SPREADERS
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,695 378,664
kWh
Natural Gas $24,280 6,904
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $971 $437 $1,102
12,896
kWh
- $(-131.0)
02 2.6232: Install set-back timers $1,954 $1,701 $1,954
22,567
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,105 $50 $2,105
24,326
kWh
- -
04 2.2437: Recover waste heat from equipment $457 $344 - $457
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $97 $100 $97
1,172
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $66 $20 $66
879
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,589 $2,500 - $1,589
-
MMBtu
-
TOTAL RECOMMENDED $7,239 $5,152 $5,324
61,840
kWh
$2,046
-
MMBtu
$(-131.0)
TOTAL IMPLEMENTED $5,096 $2,208 $5,227
60,668
kWh
- $(-131.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs