| Assessment Year | 1992 |
|---|---|
| Principal Product | SPREADERS |
| NAICS |
n/a
|
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 76 |
| Plant Area |
n/a
|
| Annual Production | 2,000
pieces
|
| Production Hrs. Annual | 2,184
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,695 | 378,664 |
kWh
|
$0.086 |
| Natural Gas | $24,280 | 6,904 |
MMBtu
|
$3.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,239 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,096 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $971 | $437 |
$1,102
12,896
kWh
|
- | $(-131.0) | |
| 02 | 2.6232: Install set-back timers | $1,954 | $1,701 |
$1,954
22,567
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,105 | $50 |
$2,105
24,326
kWh
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $457 | $344 | - |
$457
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $97 | $100 |
$97
1,172
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $66 | $20 |
$66
879
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,589 | $2,500 | - |
$1,589
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $7,239 | $5,152 |
$5,324
61,840
kWh
|
$2,046
-
MMBtu
|
$(-131.0) | ||
| TOTAL IMPLEMENTED | $5,096 | $2,208 |
$5,227
60,668
kWh
|
- | $(-131.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs