Assessment Year | 1992 |
---|---|
Principal Product | SPREADERS |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
n/a
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,695 | 378,664 |
kWh
|
$0.086 |
Natural Gas | $24,280 | 6,904 |
MMBtu
|
$3.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,239 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,096 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $971 | $437 |
$1,102
12,896
kWh
|
- | $(-131.0) | |
02 | 2.6232: Install set-back timers | $1,954 | $1,701 |
$1,954
22,567
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,105 | $50 |
$2,105
24,326
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $457 | $344 | - |
$457
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $97 | $100 |
$97
1,172
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $66 | $20 |
$66
879
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,589 | $2,500 | - |
$1,589
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $7,239 | $5,152 |
$5,324
61,840
kWh
|
$2,046
-
MMBtu
|
$(-131.0) | ||
TOTAL IMPLEMENTED | $5,096 | $2,208 |
$5,227
60,668
kWh
|
- | $(-131.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs