ITAC Assessment: UA3025
ITAC logo
ITAC Assessment: UA3025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Carbon Fiber
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range greater than $500
M
# of Employees 233
Plant Area 477,392
ft2
Annual Production 5,400,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,009,835 62,653,672
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,774 $8,081 $38,774
605,846
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $26,515 $2,400 $26,515
414,293
kWh
03 2.4239: Eliminate or reduce compressed air usage $24,911 $4,000 $24,911
389,227
kWh
04 2.4224: Upgrade controls on compressors $18,334 $2,000 $18,334
286,461
kWh
05 2.4239: Eliminate or reduce compressed air usage $18,298 $18,000 $18,298
285,910
kWh
TOTAL RECOMMENDED $126,832 $34,481 $126,832
1,981,737
kWh
TOTAL IMPLEMENTED $38,774 $8,081 $38,774
605,846
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs