ITAC Assessment: SF0529
ITAC logo
ITAC Assessment: SF0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 45,000
ft2
Annual Production 100
Tgal
Production Hrs. Annual 3,228
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,763 582,883
kWh
Electricity Demand $29,179 2,220
kW-mo/yr
LPG $35,166 1,667
MMBtu
TOTAL YEARLY COSTS $132,108
RECOMMENDED SAVINGS* $25,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $9,136 $1,467 $2,235
19,225
kWh
- $6,901
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $283 $150 $242
2,081
kWh
$41
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,163 $17,090 $5,648
48,583
kWh
$2,327
-
kW-mo/yr
- $2,135 $53
04 2.2511: Insulate bare equipment $631 $1,040 - - $631
-
MMBtu
- -
05 2.2691: Shut off cooling if cold outside air will cool process $5,200 $13,166 $5,200
44,729
kWh
- - - -
TOTAL RECOMMENDED $25,413 $32,913 $13,325
114,618
kWh
$2,368
-
kW-mo/yr
$7,532
-
MMBtu
$2,135 $53
TOTAL IMPLEMENTED $25,413 $32,913 $13,325
114,618
kWh
$2,368
-
kW-mo/yr
$7,532
-
MMBtu
$2,135 $53