ITAC Assessment: IA0021
ITAC logo
ITAC Assessment: IA0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SANDPAPER & PLASTIC BRUSHES
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area
n/a
Annual Production 25,000,000
lb
Production Hrs. Annual 8,448
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,663 9,742,673
kWh
Natural Gas $37,505 12,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $33,761 $250 $33,761
815,064
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $5,477 $250 $5,477
118,113
kWh
-
03 2.6232: Install set-back timers $24,027 $50 $24,027
518,171
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,929 $353 $12,282
264,947
kWh
$(-353.0)
05 2.6232: Install set-back timers $45 $150 $45
879
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $20,195 $52,570 $20,195
435,522
kWh
-
07 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $10,464 $2,700 $10,464
225,674
kWh
-
08 2.4133: Use most efficient type of electric motors $330 $4,910 $330
7,034
kWh
-
TOTAL RECOMMENDED $106,228 $61,233 $106,581
2,385,404
kWh
$(-353.0)
TOTAL IMPLEMENTED $12,259 $5,263 $12,612
271,981
kWh
$(-353.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs