ITAC Assessment: IA0002
ITAC logo
ITAC Assessment: IA0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AUTO ACCESSORIES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,152 3,509,672
kWh
Natural Gas $81,106 23,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $100 $3,080
75,615
kWh
-
03 2.4133: Use most efficient type of electric motors $545 $2,336 $545
13,189
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,727 $100 $1,727
42,497
kWh
-
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $527 - - $527
-
MMBtu
06 2.7261: Install timers and/or thermostats $446 $300 $446
10,844
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $261 $141
3,517
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $230 $50 $230
5,569
kWh
-
TOTAL RECOMMENDED $6,696 $3,147 $6,169
151,231
kWh
$527
-
MMBtu
TOTAL IMPLEMENTED $6,696 $3,147 $6,169
151,231
kWh
$527
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs